Vertical Integration: Building Up, Not Out
Butler Pre-Engineered Metal Buildings by Cook & KrupaCook & Krupa

Frontgrade Technologies, a leader in RF and electronic solutions for aerospace and defense, faced storage challenges due to limited floor space and low ceiling height. Cook & Krupa, in collaboration with Butler Manufacturing™ and Abel Womack, provided an innovative solution: a custom 40-foot Butler Pre-Engineered silo structure housing a Kardex Remstar Vertical Lift Module (VLM). This vertical integration maximized storage capacity, improved inventory management, and reclaimed valuable floor space. Despite a six-month COVID-19 permitting delay, the project was completed within a year, offering a rapid return on investment. Discover how this tailored solution transformed Frontgrade’s operations in our detailed case study.